Industrial Projects

Industrial Projects

Project Title:

EPC contract for the construction and commissioning of a 70 Ton per day Chlor-Alkali.

Plant Project Details:

FATA EPC, a division of FATA Spa, has won the EPC contract for the construction and commissioning of a 70 Ton per day ChlorAlkali Plant. The contract has been awarded by Union Chlorine L.L.C., a joint venture between Oman Chlorine SAOG and Horizon Energy L.L.C., in cooperation with two other investors.
Project Duration: 12 Months | Project Location: Abu Dhabi, UAE

Scope Offered:

  • Preparation of workshop & installation drawings, red line mark ups, as built drawings etc.
  •  Installation of all electrical & instrumentation equipment.
  •  Prefabrication, installation & Erection of all metallic & non-metallic piping items & pipe.
  • supports.35,000 WDI of Piping fab/erection; Approx. 1500 Nos of valve erection.
  •  Supply & installation of piping insulation material
  •  Design, supply & erection of Pre-engineered steel structural buildings, steel structural works.
  • 675 MT of steel structure including pipe support & 650 MT of Equipment erection.
  •  Supply, prefabricate, & install storage tanks, roof extract fans.

EPCC for Carbon Black and Delayed Coker (CBDC) Plant

The CBDC plant, to be built at Takreer‘s chemical refining
complex in Ruwais, Abu Dhabi, will have a capacity to produce
40,000tpa of carbon black and 30,000 barrels a day of crude oil.
Samsung Engineering has won the project from the Abu Dhabi
Oil Refining Company (TAKREER) to construct the plant. Field
Piping construction works for the project was awarded to
Samsung Engineering who has sub contracted the work to MKG
to construct the plant.
Project Duration: 12 Months | Project Location: Abu Dhabi, UAE

Scope:

  • Preparation of workshop & installation drawings, red line mark ups, as built drawings etc.
  •  Installation of all electrical & instrumentation equipment.
  •  Prefabrication, installation & Erection of all metallic & non-metallic piping items & pipe.
  • supports.35,000 WDI of Piping fab/erection; Approx. 1500 Nos of valve erection.
  •  Supply & installation of piping insulation material
  •  Design, supply & erection of Pre-engineered steel structural buildings, steel structural works.
  • 675 MT of steel structure including pipe support & 650 MT of Equipment erection.
  •  Supply, prefabricate, & install storage tanks, roof extract fans.

Takreer Ruwais Refinery Expansion Project #3

The Ruwais Refinery Expansion Project, awarded to SAMSUNG ENGINEERING will increase TAKREER’s refining capacity of crude oil by 417,000 Barrels per day and nearly double its production of transportation fuels; Gasoline, Jet and Diesel. Takreer operates today at 490,000 Barrels per day name plate capacity at its two sites in Abu Dhabi and Ruwais. MKG was subcontracted by SAMSUNG to carry out the following scope of services Project Duration: 30 Months | Project Location: Abu Dhabi, UAE

Scope

  • Civil Mechanical, Electrical, Instrumentation and Telecommunication (CMEI) Installation Works.
  •  Integrated project management system using Spoolgen and customised software AMOGH™
  •  Mechanical, Piping & Electrical & Instrumentation construction management using AMOGH™
    ➢ Pipe Support Management & Test Pack Movement Control Services
    ➢ E&I works planning, progress monitoring & reporting, Cable management and cable termination
    services

ASAB Full Feld Development Project

The Ruwais Refinery Expansion Project, awarded to SAMSUNG ENGINEERING will increase TAKREER’s refining capacity of crude oil by 417,000 Barrels per day and nearly double its production of transportation fuels; Gasoline, Jet and Diesel. Takreer operates today at 490,000 Barrels per day name plate capacity at its two sites in Abu Dhabi and Ruwais. MKG was subcontracted by SAMSUNG to carry out the following scope of services Project Duration: 30 Months | Project Location: Abu Dhabi, UAE

Scope Offered

  • Civil Mechanical, Electrical, Instrumentation and Telecommunication (CMEI) Installation Works for Pre-shutdown works at the Remote Degassing Station-6
  •  Integrated project management system using Spoolgen and customized software AMOGH™
  •  Mechanical, Piping & Electrical & Instrumentation construction management using AMOGH™
  •  Pipe Support Management & Test Pack Movement Control Services.
  •  E&I works planning, progress monitoring & reporting, Cable management and cable termination services

GASCO - 4th Natural Gas Liquid (NGL) Train

The project involves construction of an NGL recovery train to process 27, 000 TPD NGL/LPG. This will increase its present offshore gas production by 1 billion cu. ft/d of high pressure gas. It also includes products like 4750 TPD ethane, 7850 TPD propane, 9360 TPD butane and 5540 TPD paraffinic naphtha.
Project Duration: 32 Months | Project Location: Abu Dhabi, UAE

Scope Offered:

  • Integrated project management system using Spoolgen and customized software AMOGH™
  •  Spool & Document Management System
  •  Pipe Support Management & Test Pack Movement Control Services
  •  Mechanical & piping works planning, progress monitoring & reporting

Integrated Gas development project (IGD) Habshan-5

The Habshan 5 Process Plant is designed to process 1,000 million standard cubic feet per day (MMSCFD) of offshore gas from Umm Shaif and an additional 1,000 MMSCFD of onshore gas comprising of a mix of associated gas from ADCO and nonassociated high sour gas from the Habshan fields.
Project Duration: 24 Months | Project Location: Abu Dhabi.

Scope Offered:

  • Integrated project management system using Spoolgen and customized software AMOGH™
  •  Spool & Document Management System
  •  Pipe Support Management & Test Pack Movement Control Services
  •  Mechanical & piping works planning, progress monitoring & reporting

Tokuyama Malaysia Poly-Silicon Phase-2 Project

The project expands the polycrystalline silicon production capacity and build an additional poly Silicon plant in Sarawak, Malaysia by Tokuyama Corporation. Tokuyama’s goal is to raise its global share of polysilicon for solar PV cells, while aintaining its share of polysilicon for semiconductors. Tokuyama conducts a second-phase construction project to build an additional polycrystalline silicon plant at the Samalaju Industrial Park in Sarawak, Malaysia. The second-phase plant will produce polycrystalline silicon for solar cells at an annual production capacity of 13,800 tons.
Project Duration: 18 Months | Project Location: Malaysia

Scope Offered:

  • Field installation of piping (S S, Alloy Steel, Carbon Steel)
  •  Mechanical Completion
  •  Complete Piping testing & commissioning assistance

Petronas LNG Train 9 Project

JGC Group company, JGC Malaysia, it has been awarded a contract by Petronas LNG 9 Sdn.Bhd.(PL9SB), a wholly-owned subsidiary of Petronas. The contract calls for the EPCC work associated with expansion of LNG storage and shipping facilities at the Petronas’ LNG Complex (PLC) in Bintulu, Sarawak, Malaysia. The project, Train 9, will have a capacity of approximately 3.6 million tons of LNG per year and its feedstock will be supplied from PETRONAS’ newly developed offshore gas fields, off the coast of Sarawak, Malaysia.
Project Duration: 16 Months | Project Location: Malaysia

(Thro’ our associate Arc & Fusion)

SOURCING, DEPLOYMENT OF SKILLED RESOURCES & ONSITE TRAINING

We provide highly qualified professionals and skilled resource to support with the best top, middle and lower level workforce in a short time for long term basis.

We provide exclusive and qualified workforce for all sectors like, oil and gas, mechanical construction, civil construction, electrical, marine & shipyards hospitality, manufacturing, power and desalination plant, information technology & logistics. We analyze the resource requirements of our clients and ensure that our clients get the best manpower supply services. We also train people at onsite for different set of skilled and unskilled manpower in various disciplines.

WORKSHOP FACILITIES

Location of Facility:

  • Ground floor of Arc & Fusion House, TTC Industrial Area, Pawane Area: 10,000 Sq.Ft. Space for Fabrication
  • First Floor, Area: 1,600 Ft. Office Space
  • Second Floor, Area 1,200 Ft. Office Space